This is a project by Lubor Trubka Associates Architects and it is located at Port Alberni, British Columbia, Canada. Project's program: Health Clinic, Administration, Community and Cultural Centre. There are fifteen images for Tseshaht Tribal Multiplex and Health Centre.
Completed in October of 2007, the Tseshaht Health Centre and Multiplex is an example of a cooperative community venture and the use of timber as an architectural vocabulary to express the Tseshaht’s respect for nature, cultural heritage and their historical reverence for wood utilized in their daily lives. Floating on a granite bluff above the salmon-spawning Somass River in Port Alberni on Vancouver Island, the facility was conceived as a celebration of the Tseshaht Culture, honouring their historical values and inspiring a sense of pride within the community.
During ten thousand years of known history, the Tseshaht have developed sophisticated art, tradition, philosophy, social structure and construction technology using the versatile wood properties of the Pacific rainforest. Following the arrival of early European explorers and colonists to Canada, their traditional ways of life were destroyed and their population decimated by disease and alcoholism forcing many tribe members to become dependent on government support. But in the last 30 years they have experienced a miraculous cultural and social renaissance, and have re-emerged as a politically, culturally and economically organized and sophisticated society.
Although most members today are educated or trained in various occupations, they have maintained their inherent talent and skill to work and build with wood. So, when the construction of an important community project takes place, many band members become artisans for their own building. In this way, a significant part of the capital cost invested into the building remains in the community. With the entire community’s direct involvement in the plan, program, design, finance, and eventually, construction, these projects become symbols of achievement and pride and remain well cared for.
The collaboration with all user groups for the design development was accomplished through a series of design charrettes. To maintain the symbiotic relationship between the internal spaces and the natural exterior, and to appreciate the natural light, the sun’s rays are welcomed to penetrate the building on their daily path, evoking positive ambiance within the high-volume areas, and the small individual offices. In this way, the beautiful surrounding landscape can be appreciated as much inside as outside.
The natural yet challenging character of the site offered a unique opportunity for a nature-preserving solution. Instead of disturbing the site with rock blasting, leveling and massive excavations, the building design evolved as a partially cantilevered wooden structure that appears to float above the outlines of the rocky bluff and the river’s edge.
Located at the north tip of Alberni Inlet on the west coast of Vancouver Island, the site experiences tidal fluctuations of up to 5 m and is also within the highest seismic zone. To cope with such conditions, the structure is a combination of post-and-beam frames in-filled with glazing and a limited amount of strategically places shear walls, utilizing engineered wood products and a variety of natural lumber products harvested by the Tseshaht people from their own forest reserves. The construction was carried out by about 50 band members, under professional supervision. The near-to-millwork design concept, which exposes every element of the structure as an architectural feature and vocabulary, required precision pre-manufacturing of each element. This was done on-site before assembly and erection by predominantly band labour . It also presented a great challenge to conceal all of the electrical and mechanical distribution networks, and locate voluminous equipment without affecting the integrity of the architecture and the structure.
The design and construction of the facility successfully overcame significantly more than the usual amount of inherent challenges, namely:
Wood materials used on the project included: glulam columns and beams; parallam, microlam, timber strand and I joists; Douglas fir T&G decking, plywood, standard framing lumber; mixed hemlock, spruce and fir laminated siding boards; vertical grain Douglas fir windows and doors; and custom millwork featuring red and yellow cedar, Douglas fir and maple.
Awards: